AmNor Hydro West Inc. The proposed project will be located at the Unity Reservoir, a Bureau of Reclamation project. The dam is located near the City of Hereford, Oregon to the north of Road no 245. The project includes the existing dam, outlet works, and the tailrace side of the dam. Feasibility studies and preliminary design are to be conducted during the preliminary permit period. During this period the project concept will be refined to fully and economically utilize the available water resources.
Estimated average annual energy production: 17.5 GW Installed capacity 4 MW Hydraulic Head 100 Feet Number of Turbines TBD Rated Capacity TBD Turbine Condition New
. |
|
Preliminary Permit at Unity Dam issued by FERC |
|
Date: 7/20/2011 |
|
Unity Dam, Oregon Potential Production: 17.5 GWh |
|
AmNor Hydro West Inc. The proposed project will be located at the Yakima Reservoir. The project dam is located in 37 Water Resource Inventory Areas (WRIA) – Lower Yakima, near the City of Richland, Washington state; east-south from the crossroads no 240 and no 225. The project includes the existing dam, outlet works, and the tailrace side of the dam. Feasibility studies and preliminary design are to be conducted during the preliminary permit period. During this period the project concept will be refined to fully and economically utilize the available water resources.
Estimated average annual energy production: 6480 MWh Installed capacity 1.4 MW Hydraulic Head 12 Feet Number of Turbines TBD Rated Capacity TBD Turbine Condition New
|
|
Preliminary Permit at Horn Rapids Dam issued by FERC |
|
Date: 7/20/2011 |
|
Horn Rapids Dam, Washington Potential Production: 6,5 GWh |
|
AmNor Hydro West Inc. The proposed project will be located at the Lake Washington Ship Canal. The project dam is located in 08 Water Resource Inventory Areas (WRIA) – Cedar Sammamish, near the Ballard, Washington state; within the Salmon Bay. The project includes the existing dam, outlet works, and the tailrace side of the dam. The dam is concrete gravity type. Reservoir purpose is generally navigation and recreation. Feasibility studies and preliminary design are to be conducted during the preliminary permit period. During this period the project concept will be refined to fully and economically utilize the available water resources. .
Estimated average annual energy production: 17286 MWh Installed capacity 5000 kW Hydraulic Head 26 Feet Number of Turbines TBD Rated Capacity TBD Turbine Condition New
|
|
Filing for Preliminary Permit at Hiram Dam accepted by FERC |
|
Date: 1/24/2011 |
|
Hiram Dam, Washington Potential Production: 17,3 GWh |
|
AmNor Hydro West Inc. The proposed project will be located at the Clear Lake Reservoir, a Bureau of Reclamation project. The dam is located near the City of Naches, Washington to the south of Road no 12. The project includes the existing dam, outlet works, and the tailrace side of the dam. Feasibility studies and preliminary design are to be conducted during the preliminary permit period. During this period the project concept will be refined to fully and economically utilize the available water resources .
Estimated average annual energy production: 3900 MWh Installed capacity 922.5 kW Hydraulic Head 35 Feet Number of Turbines TBD Rated Capacity TBD Turbine Condition New
|
|
Filing for Preliminary Permit at Clear Creek Dam accepted by FERC |
|
Date: 1/24/2011 |
|
Clear Creek Dam, Washington Potential Production: 2,9 GWh |
|
AmNor Hydro West Inc. The proposed project will be located at the Lake Washington Ship Canal. The project dam is located in 08 Water Resource Inventory Areas (WRIA) – Cedar Sammamish, near the Ballard, Washington state; within the Salmon Bay. The project includes the existing dam, outlet works, and the tailrace side of the dam. The dam is concrete gravity type. Reservoir purpose is generally navigation and recreation. Feasibility studies and preliminary design are to be conducted during the preliminary permit period. During this period the project concept will be refined to fully and economically utilize the available water resources. .
Estimated average annual energy production: 17286 MWh Installed capacity 5000 kW Hydraulic Head 26 Feet Number of Turbines TBD Rated Capacity TBD Turbine Condition New
|
|
Preliminary Permit at Hiram Dam issued by FERC |
|
Date: 9/2/2011 |
|
Hiram Dam, Washington Potential Production: 17,3 GWh |

|
ENERGY OF THE FUTURE |