AmNor Hydro West Inc.

The proposed project will be located at the Unity Reservoir, a Bureau of Reclamation project.  The dam is located near the City of Hereford, Oregon to the north of Road no 245.  The project includes the existing dam, outlet works, and the tailrace side of the dam.   Feasibility studies and preliminary design are to be conducted during the preliminary permit period.  During this period the project concept will be refined to fully and economically utilize the available water resources.

 

                 Estimated average annual energy production:                                  17.5 GW

Installed capacity                                                                                     4 MW

Hydraulic Head                                                                                        100 Feet

Number of Turbines                                                                                TBD

Rated Capacity                                                                                         TBD

Turbine Condition                                                                                    New

 

.

Preliminary Permit at Unity Dam issued by FERC

Date: 7/20/2011

Unity Dam, Oregon

Potential Production: 17.5 GWh

AmNor Hydro West Inc.

The proposed project will be located at the Yakima Reservoir. The project dam is located in 37 Water Resource Inventory Areas (WRIA) – Lower Yakima, near the City of Richland, Washington state; east-south from the crossroads no 240 and no 225.  The project includes the existing dam, outlet works, and the tailrace side of the dam. Feasibility studies and preliminary design are to be conducted during the preliminary permit period.  During this period the project concept will be refined to fully and economically utilize the available water resources.

 

Estimated average annual energy production:                                  6480 MWh

Installed capacity                                                                                     1.4 MW

Hydraulic Head                                                                                        12 Feet

Number of Turbines                                                                                TBD

Rated Capacity                                                                                         TBD

Turbine Condition                                                                                    New

 

 

Preliminary Permit at Horn Rapids Dam issued by FERC

Date: 7/20/2011

Horn Rapids Dam, Washington

Potential Production: 6,5 GWh

AmNor Hydro West Inc.

The proposed project will be located at the Lake Washington Ship Canal. The project dam is located in 08 Water Resource Inventory Areas (WRIA) – Cedar Sammamish, near the Ballard, Washington state; within the Salmon Bay.  The project includes the existing dam, outlet works, and the tailrace side of the dam.   The dam is concrete gravity type. Reservoir purpose is generally navigation and recreation.  Feasibility studies and preliminary design are to be conducted during the preliminary permit period.  During this period the project concept will be refined to fully and economically utilize the available water resources.

.

 

Estimated average annual energy production:                                  17286 MWh

Installed capacity                                                                                     5000 kW

Hydraulic Head                                                                                        26 Feet

Number of Turbines                                                                                TBD

Rated Capacity                                                                                         TBD

Turbine Condition                                                                                    New

 

 

Filing for Preliminary Permit at Hiram Dam accepted by FERC

Date: 1/24/2011

Hiram  Dam, Washington

Potential Production: 17,3 GWh

AmNor Hydro West Inc.

The proposed project will be located at the Clear Lake Reservoir, a Bureau of Reclamation project.  The dam is located near the City of Naches, Washington to the south of Road no 12.  The project includes the existing dam, outlet works, and the tailrace side of the dam.    Feasibility studies and preliminary design are to be conducted during the preliminary permit period.  During this period the project concept will be refined to fully and economically utilize the available water resources .

 

Estimated average annual energy production:                                  3900 MWh

Installed capacity                                                                                     922.5 kW

Hydraulic Head                                                                                        35 Feet

Number of Turbines                                                                                TBD

Rated Capacity                                                                                         TBD

Turbine Condition                                                                                    New

 

 

Filing for Preliminary Permit at Clear Creek Dam accepted by FERC

Date: 1/24/2011

Clear Creek Dam, Washington

Potential Production: 2,9 GWh

AmNor Hydro West Inc.

The proposed project will be located at the Lake Washington Ship Canal. The project dam is located in 08 Water Resource Inventory Areas (WRIA) – Cedar Sammamish, near the Ballard, Washington state; within the Salmon Bay.  The project includes the existing dam, outlet works, and the tailrace side of the dam.   The dam is concrete gravity type. Reservoir purpose is generally navigation and recreation.  Feasibility studies and preliminary design are to be conducted during the preliminary permit period.  During this period the project concept will be refined to fully and economically utilize the available water resources.

.

 

Estimated average annual energy production:                                  17286 MWh

Installed capacity                                                                                     5000 kW

Hydraulic Head                                                                                        26 Feet

Number of Turbines                                                                                TBD

Rated Capacity                                                                                         TBD

Turbine Condition                                                                                    New

 

 

Preliminary Permit at Hiram Dam issued by FERC

Date: 9/2/2011

Hiram  Dam, Washington

Potential Production: 17,3 GWh

ENERGY OF THE FUTURE

Home

About

Contact

NEWS